News
INSTALLATION SUCCESSFULLY COMPLETED IN ONE OF THE LARGEST MINES IN SOUTH AMERICA
After months of design and on-site work, the installation of a centralized system has been successfully completed at one of the largest open-pit mines in South America. The site, with estimated reserves of 1.6 billion tons, produces approximately 200.000 tons of copper per year.
Sibilia has built a fixed system of over 1.500 meters, configured on two lines, with the S30E central unit and two PR.3058C filter separators, characterized by a large filtration surface area.
The main objective is the recovery of copper concentrate, allowing its reintroduction into the production cycle and thus improving the efficiency and sustainability of the process.
In addition to recovering copper concentrate, the system helps keep production lines clean and efficient, reduces plant downtime, improves workplace air quality, and enhances operator safety.
A dedicated case study on this project will be available soon: stay tuned to discover all the details.
More news
SIBILIA WILL PARTICIPATE IN THE ECOMONDO 2026 FAIR
From 3rd to 6th November 2026, Sibilia will participate in Ecomondo at the Rimini Expo Centre, the leading international trade fair for environmental technologies, the circular economy and ecological...
Read more
A visit to Sibilia: a closer look at Italian manufacturing
In recent days, we had the pleasure of welcoming Member of the European Parliament Isabella Tovaglieri to our headquarters in Castelletto Ticino, where we had the opportunity to introduce her to our...
Read more
HARMATTAN: the desert wind becomes innovation
Harmattan is a hot, dry wind that sweeps across the Sahara, carrying vast quantities of sand.
This natural phenomenon inspired the name of the new industrial vacuum system developed by Sibilia —...
Read more